Sanibel Island Causeway Reconstruction

  • Marine Construction, Shoreline Protection
  • Lee County
  • Florida
CHC conducted emergency repairs on the Sanibel Causeway in Lee County, FL, after Hurricane Ian, installing 125,000 square feet of sheet pile to shore bridge approaches and beginning construction of a 200,000-ton armor stone revetment to enhance future storm resilience.

Hurricane Ian Recovery - Sanibel Causeway Reconstruction

Emergency Repairs to Sanibel Causeway in Lee County, Florida. CHC’s work involved the emergency response and mobilization of barges, cranes, push boats, and trestle system to the causeway immediately following its damage during Hurricane Ian. This work entailed shoring of bridge approaches with sheet pile and bridge resiliency repairs to facilitate reopening the causeway. In addition, 125,000 SF of permanent sheet pile was installed around the bridge abutments.

CHC’s ongoing efforts at the causeway are to create an armor stone revetment system consisting of 200,000 tons of stone and over 200,000 SF of sheet pile. The process has involved multiple specialized barge setups to reinforce critical areas of the causeway. This vital marine infrastructure work will reinforce the bridge abutments that were damaged during Hurricane Ian and protect against future storm events.

2022
Florida
Marine Construction, Shoreline Protection
Founded on our commitment to environmental responsibility, Continental Heavy Civil is a leader in maritime infrastructure projects. Since our establishment, we have steadfastly upheld a mission to create resilient and sustainable structures for the future.
Locations
Miami, Florida
13131 SW 132nd Street
Suite 102
Miami, FL 33186
Brunswick, Georgia
800 Gloucester St.
Brunswick, GA 31520
© 2025 Continental Heavy Civil Corporation, All rights reserved.
Privacy Policy