Biscayne National Park Repairs

  • Marine Construction
  • Boca Chita Key
  • Florida
In Biscayne National Park, CHC completed hurricane repairs on three islands, restoring Boca Chita Key’s shoreline, replacing Elliott Key’s boardwalk, and constructing a new dock at Adams Key, while also rebuilding the Black Point Marina Jetty and installing a floating dock and bridge at Convoy Point.

Biscayne National Park Multiple Hurricane Repairs

Located within the shallow protected waters of the Biscayne National Park, this project included multiple hurricane repairs at 3 remote island locations. Boca Chita Key beach restoration required barging sand from the mainland to repair the key’s eroded shoreline. Elliott Key consisted of the demolition and removal of a boardwalk within a sensitive mangrove environment.

Adams Key entailed the demolition and removal of a concrete dock and construction of a new precast post tension dock with new pilings. CHC also undertook the reconstruction of the Black Point Marina Jetty and pedestrian bridges. At Convoy Point, CHC installed a new floating dock system, a new pedestrian bridge over protected marine habitat, and reconstructed the Convoy Point Jetty.

2021
Florida
Marine Construction
Founded on our commitment to environmental responsibility, Continental Heavy Civil is a leader in maritime infrastructure projects. Since our establishment, we have steadfastly upheld a mission to create resilient and sustainable structures for the future.
Locations
Miami, Florida
13131 SW 132nd Street
Suite 102
Miami, FL 33186
Brunswick, Georgia
800 Gloucester St.
Brunswick, GA 31520
© 2025 Continental Heavy Civil Corporation, All rights reserved.
Privacy Policy